Skip to content

build(deps): bump github.com/gofiber/fiber/v2 from 2.50.0 to 2.51.0 in /jwt #29

build(deps): bump github.com/gofiber/fiber/v2 from 2.50.0 to 2.51.0 in /jwt

build(deps): bump github.com/gofiber/fiber/v2 from 2.50.0 to 2.51.0 in /jwt #29

Triggered via pull request November 14, 2023 21:57
Status Failure
Total duration 29s
Artifacts

test-jwt.yml

on: pull_request
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 3 warnings
Tests (1.20.x)
Process completed with exit code 1.
Tests (1.19.x)
The job was canceled because "_1_20_x" failed.
Tests (1.19.x)
Process completed with exit code 1.
Tests (1.18.x)
The job was canceled because "_1_20_x" failed.
Tests (1.18.x)
The operation was canceled.
Tests (1.21.x)
The job was canceled because "_1_20_x" failed.
Tests (1.21.x)
The operation was canceled.
Tests (1.20.x)
Restore cache failed: Dependencies file is not found in /home/runner/work/contrib/contrib. Supported file pattern: go.sum
Tests (1.19.x)
Restore cache failed: Dependencies file is not found in /home/runner/work/contrib/contrib. Supported file pattern: go.sum
Tests (1.21.x)
Restore cache failed: Dependencies file is not found in /home/runner/work/contrib/contrib. Supported file pattern: go.sum