Skip to content

Merge pull request #123 from joshka/jm/additional-log-levels #247

Merge pull request #123 from joshka/jm/additional-log-levels

Merge pull request #123 from joshka/jm/additional-log-levels #247

Triggered via push November 16, 2024 01:56
Status Cancelled
Total duration 1m 40s
Artifacts

ci.yml

on: push
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Test (windows-latest, stable)
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
Test (windows-latest, stable)
The operation was canceled.
clippy
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
clippy
The operation was canceled.
Coverage
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
Coverage
The operation was canceled.
CI
Process completed with exit code 1.