You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
leninmehedy opened this issue
Feb 26, 2024
· 2 comments
Assignees
Labels
BugA error that causes the feature to behave differently than what was expected based on design docsP1High priority issue. Required to be completed in the assigned milestone.
if we check if the nodes are active before we start them, we could see that they are already running and also skip the starting nodes step. we might need a better way to check if they are running than looking at only the logs, though. the process could have been killed.
leninmehedy
added
P1
High priority issue. Required to be completed in the assigned milestone.
Bug
A error that causes the feature to behave differently than what was expected based on design docs
and removed
Feature Enhancement
Enhancing an existing feature driven by business requirements. Typically backwards compatible.
labels
Feb 29, 2024
BugA error that causes the feature to behave differently than what was expected based on design docsP1High priority issue. Required to be completed in the assigned milestone.
Error happened when I ran
solo node start
. We need to provide some instructions to the user on how it can be resolved.We probably need to allow user to retry the mirror-node deployment part only.
The text was updated successfully, but these errors were encountered: